PT. TRANSCELLCOM, established as a service provider company especially for telecommunication infrastructure network. With telecommunication technology infrastructure sector as our core business we are providing services for telecommunication infrastructure, implementation and support in Survey, Installation, Commissioning, Integration, Quality Audit and Materials Supply.
VISION
To support customer to became leader in quality and services.
MISSION
To take a part in developing communication technology and information and nationally.
PT. TRANSCELLCOM, as an answer for rapidly growth telecommunication technology and a readiness sign for Indonesian native company, is competing in this globalization era maturely in handling telecommunication technology.
We have high competence resource, full commitment and wide experiences in Radio Base Station both macro and micro GSM, CDMA, Wireline, PSTN, Optical Network, Wireless Local Loop, Microwave both macro and micro, SDH, and PDH.
PT. TRANSCELLCOM, a service provider company has commitment to deliver overall infrastructure network telecommunication.
TOWER SURVEY USING DRONE
SIS (Site Investigation Survey)
SIS is the process of investigating the location of the tower/BTS construction plan, which is an important matter in development and is very important affect the success rate for the next process. Conduct Site Hunting/SITAC (Site Acquisition) as an effort to find the right location and feasible to be used as a BTS location. Location search is an initial survey before other surveys are carried out, this survey is to find the closest location to the nominal coordinates in the network design (Nominal RF and Transmission Network Design).
SES (Site Engineering Survey)
SES in an investigative process carried out related to Engineering work. At the new sites, you usually have to pay attention to road access, the location of the PLN position, the contour of land, KWH Meter load used, measuring the position of the placement area whether there is still room for the installation of new device. Next also on the tower whether the position of the antena to be installed has a place as planned.
LOS (Line of Sight) Survey
LOS is likened to the visual distance between the eye and object it sees. Survey transmission is carried out to avoid obstruction from a microwave signal path and determine whether the transmission in used as required. To avoid mistakes, the survey team usually goes to the field and provides data in the form of nominal point coordinate for the Near End and Far end from operator or vendor.
MAINTENANCE, EXPANSION, SUPPLYING and PERFORMANCE SUPPORT
Equipment Dismantling
Service for dismantling BSC/BTS/Transmission equipments, includes: dismantling existing equipments and collected and listing equipment was dismantle.
Equipment Relocation
A service for BTS/Transmission site relocation with includes: dismantling of existing equipments and collected and listing equipment was dismantle, reinstall, rehoming, re-parenting, commissioning and integration to the life network with same good performance.
Equipment Swapping
A service in swapping BSC/BTS/Transmission equipments that includes: Dismantling of existing equipments, installing new equipments, commissioning, and integration to the network system.
Materials Supplying
A service for supplying materials that request by customer.
INSTALLATION, COMMISSIONING, INTEGRATION and QUALITY AUDIT
Installation BTS/Transmission
Installation of BTS/Transmission with high standard and good quality, as instructed and standardized.
Commissioning and Integration of BTS/Transmission
Commissioning BTS/Transmission service is to check all performances of equipments as a final check of installed equipments versus design/installation binder.
Site Quality Audit
Site Quality Audit installation is carried out to check the quality of installation equipment workmanship on site. This service is performed as an optional service required by customer.
DRIVE TEST SERVICES
Drive Test Services included following services
Provide Drive Test Service team based on requirement and periode service on the PO, Confirm network evaluation schedule and target, Benchmarking based on Single Site Verification (SSV) report requirements – SSV shall be one of requirement for the WiMAX Rollout network to achieve service readiness. Adjust antenna for Azimuth and Tilting, Drive Test Evaluation, SSV Report within 2×24 hours.
Specification
Check parameter (Site Name, Azzimuth, Downtilt Antenna, Height Antenna, Longtitude and Latitude) required in the SSV report. SSV Report Template
PT. TRANSCELLCOM
Gedung Pembina Graha
Jl. D.I Panjaitan No. 45
Rawa Bunga – Jatinegara
Jakarta Timur 13420
E-mail :
arif@transcellcom.com
Contact Person :
Mr. Arif Nurdin
Mobile Phone : 0818 900 580